货物出口协议
货物出口协议

免费影视、动漫、音乐、游戏、小说资源长期稳定更新! 👉 点此立即查看 👈
签约地点:_________
签订日期:_________年_________月_________日
卖方:_________
买方:_________
买卖双方经协商同意按下列条款成交:
1.货物名称、规格和质量 :_________
2.数量:_________
3.单价及价格条款:_________
(这里有个关键点需要留意:除非合同里另有规定,否则“FOB”、“CFR”和“CIF”这些贸易术语,都得按照国际商会制定的《XX年国际贸易术语解释通则》(Incoterms XX)来理解和执行。这是国际货物买卖的通用“语言”,能避免很多后续扯皮。)
4.总价:_________
5.允许溢短装:_________%
6.装运期限:
收到可以转船及分批装运之信用证_________天内装运。
7.付款条件:_________
买方必须在_________前,把一份保兑的、不可撤销的、可转让、可分割的即期付款信用证开到卖方手里。这份信用证的有效期得延长到装运期后_________天,在中国到期,并且必须白纸黑字注明允许分批装运和转船。
话说回来,如果买方没在规定时间内开出信用证,卖方有权通知取消合同,或者选择接受买方未履行的全部或部分合同,甚至对因此遭受的损失提出索赔。这一条是卖方的重要保障。
8.包装:_________
9.保险:_________
按发片金额的_________%投保_________险,由_________负责投保。
10.品质/数量异议:_________
如果买方要提索赔,时间窗口可得卡准了:品质问题,必须在货到目的港30天内提出;数量问题,必须在15天内提出。另外,如果货物出现的问题,责任明显在保险公司、轮船公司或其他运输/邮递机构那边,卖方可不担这个责任。这算是划清了责任边界。
11.不可抗力:
如果遇到人力不可抗拒的情况,导致合同没法履行,或者部分、全部货物得延迟交货,卖方概不负责。合同里说的不可抗力,特指那些不可预见、不能避免且无法克服的客观情况。
12.仲裁:
凡是因本合同引起或跟本合同有关的任何争议,协商解决不了怎么办?那就提交给_________仲裁委员会。仲裁规则按申请时该会现行的来。仲裁裁决是终局的,对双方都有约束力。这意味着选择了仲裁,通常就放弃了诉讼的权利。
13.通知:
所有通知都得用_________文写,并按下面地址通过传真/电子邮件/快件送给各方。如果地址变了,一方应在变更后_________天内书面通知另一方。保持沟通渠道准确畅通,是合作的基础。
卖方:_________
买方:_________
14.其他:
本合同有中英文两种文本,两种文本效力同等。合同一式_________份。自双方签字(盖章)之日起生效。
卖方(签字):_________ 买方(签字):_________
附件
No.:_________
Signed at:_________
Date:_________年_________月_________日
Seller:_________
Buyer:_________
The undersigned Seller and Buyer ha ve agreed to close the following transactions according to the terms and conditions set forth as below:
1.Name, Specifications and quality of commodity:_________
2.Quantity:_________
3.Unit price and terms of delivery:_________
The terms FOB,CFR,or CIF shall be subject to the International Rules for the Interpretation of Trade Terms (Incoterms XX) provided by International Chamber of Commerce (ICC) unless otherwise stipulated herein.)
4.Total amount:_________
5.More or less:_________%。
6.Time of shipment:
Within _________ days after receipt of L/C allowing transhipment and partial shipment.
7.Terms of payment:
By Confirmed, Irrevocable, Transferable and Divisible L/C to be a vailable by sight draft to reach the Seller before _________ and to remain valid for negotiation in China until _________after the Time of Shipment. The L/C must specify that transshipment and partial shipments are allowed.
The Buyer shall establish a Letter of Credit before the above-stipulated time, failing which, the Seller shall ha ve the right to rescind this Contract upon the arrival of the notice at Buyer or to accept whole or part of this Contract non fulfilled by the Buyer, or to lodge a claim for the direct losses sustained, if any.
8.Packing:_________
9.Insurance:
Covering _________ Risks for_________110% of invoice value to be effected by the _________.
10.Quality/Quantity discrepancy:
In case of quality discrepancy, claim should be filed by the Buyer within 30 days after the arrival of the goods at port of destination, while for quantity discrepancy, claim should be filed by the Buyer within 15 days after the arrival of the goods at port of destination. It is understood that the Seller shall not be liable for any discrepancy of the goods shipped due to causes for which the Insurance Company, Shipping Company, other transportation organization /or Post Office are liable.
11.Force Majeure
The Seller shall not be held responsible for failure or delay in delivery of the entire lot or a portion of the goods under this Sales Contract in consequence of any Force Majeure incidents which might occur. Force Majeure as referred to in this contract means unforeseeable, una voidable and insurmountable objective conditions.
12.Arbitration:
Any dispute arising from or in connection with the Sales Contract shall be settled through friendly negotiation. In case no settlement can be reached, the dispute shall then be submitted to _________ for arbitration in accordance with its rules in effect at the time of applying for arbitration. The arbitral award is final and binding upon both parties.
13.Notices:
All notice shall be written in _________ and served to both parties by fax/e-mail /courier according to the following addresses. If any changes of the addresses occur, one party shall inform the other party of the change of address within _________ days after the change.
Seller:_________
Buyer:_________
14.Other Terms
This Contract is executed in two counterparts each in Chinese and English, each of which shall be deemed equally authentic. This Contract is in _________ copies effective since being signed/sealed by both parties.
Buyer(signature):_________ Seller(signature):_________
相关攻略
进出口报关单证处理全流程自动化:从人工困局到智能破局的实战指南 全球贸易节奏日益加快,企业面临的报关合规压力与效率挑战也水涨船高。对于跨国制造、跨境电商以及供应链上的玩家而言,实现报关单证处理的全流程自动化,早已不是一道选择题,而是一道关乎生存与发展的必答题。毕竟,谁还耗得起在浩如烟海的发票、提单、
货物出口协议 签约地点:_________ 签订日期:_________年_________月_________日 卖方:_________ 买方:_________ 买卖双方经协商同意按下列条款成交: 1.货物名称、规格和质量 :_________ 2.数量:_________ 3.单价及价格条款
3月2日消息,近日,吉利汽车公布2026年2月销量数据,当月品牌总销量达206160辆,连续两个月实现同比正增长。海外市场方面,2月出口销量达60879辆,同比增长138%。当月吉利汽车新能源销量1
2月21日消息,崔东树发文称,2025年海关数据显示中国汽车整车出口达832万台,这一数据虽引发市场部分质疑,但跳出单一整车出口的统计维度,从全球化全产业链视角来看,中国制造及自主品牌汽车的海外销量
中国汽车市场正迎来一个里程碑式的结构变革。根据中国汽车工业协会(以下简称“中汽协”)的最新预测,2026年,中国汽车总销量预计约为3475万辆,同比微增1%。其中,最大的亮点在于新能源汽车,其销
热门专题
热门推荐
一、 宏观IT架构痛点:传统RPA CoE为何难以为继? 走过数字化建设的初期阶段,很多企业都遇到过类似的瓶颈:自动化项目起初顺风顺水,一旦进入规模化阶段,却常常陷入“先易后难、最终停滞”的怪圈。复盘起来,这背后有几个根本性的IT架构痛点,几乎成了行业通病。 首当其冲的,是“脚本维护地狱”。传统RP
芝麻交易所(芝麻gate)官方登录指南:安全、高效访问全攻略 对于数字资产交易者而言,一个稳定、安全的平台入口是投资旅程的起点。本文将为您详细拆解芝麻交易所(芝麻gate)官方网站的登录与访问方法,助您一步到位,安全便捷地开启交易之旅。通过其官方网页版,您不仅能获得稳定高效的交易环境,还能实时掌握市
一、 传统自动化架构的脆性原理:从一行报错日志说起 聊到企业IT架构的演进,有一个成本黑洞常常被忽视,那就是自动化流程的运维。很多CIO都有同感:业务系统一旦SaaS化或进入敏捷迭代的快车道,原先那些设计精良的自动化脚本,失效就成了家常便饭。望着堆积如山的维护工单,一个核心课题浮出水面:如何打造一个
话说回来,当企业超自动化的浪潮进入深水区,聪明的 CIO 们早就意识到,单纯地采购一个个单点工具,已经很难撑起他们对 IT 资产投资回报率的严苛期待了。数字员工队伍在爆炸式增长,但如果缺乏一套系统化的、覆盖从诞生到退役的智能平台来管理,局面很快就会失控:运维成本飙升、代码资产变成谁也看不懂的黑盒、合
企业级IT自动化运维与业务流程重塑,有一个环节堪称“硬骨头”和“深水区”——那就是系统登录和高频数据交互。许多CIO和IT架构师都遇到过这样的窘境:业务系统的安全策略一升级,各种预料之外的动态校验,尤其是验证码,就冒了出来,结果直接导致自动化脚本中断。这不仅仅是一场影响流程服务等级的运维事故,更会让





